Quality Control & Deliverables

6. Quality Control & Deliverables

Consultants submitting CAD files to ATL must follow quality control procedures to ensure consistency, accuracy, and compliance with airport standards. Final deliverables must meet formatting, file structure, and submission package requirements as outlined below.

Drawing Review & QA/QC Checklist

All drawings must undergo internal quality control review prior to submission. The following checklist provides a baseline for verifying compliance:

  • ✅ File naming follows ATL naming convention
  • ✅ All drawings use correct State Plane coordinate system (EPSG: 2240)
  • ✅ Layers conform to standards (per Section 2.2)
  • ✅ Titleblocks are complete, correctly placed, and up to date
  • ✅ Xrefs are correctly referenced using relative paths
  • ✅ Fonts, lineweights, and scales are legible at plot size
  • ✅ No proxy objects or embedded Xdata present
  • ✅ Sheet index included in drawing set

Submission File Format

All submittals must include the following file formats unless otherwise directed by ATL project managers:

  • ? .DWG (AutoCAD 2018 format or later)
  • ? .PDF (plotted at full sheet size)
  • ? .CTB/STB (plot style files used for printing)
  • ? Support files: Fonts, Xrefs, and any custom blocks

File Organization

Files should be organized in a clear folder structure:

  • /DWG – all CAD files
  • /PDF – plotted sheets
  • /XREF – external references
  • /CTB – plot styles
  • /FONTS – non-standard font files

Submit files as a single compressed ZIP archive named with the project number and submission date (e.g., 2340_Submittal_2025-02-24.zip).

Review Comments & Revisions

ATL will provide formal review comments after receipt of each submission. Revisions must be clearly identified using revision clouds and updated titleblocks. Use of a dedicated revision log is encouraged.